Project:

  • Grimston Mast Works
  • Working for Thales
  • Client Network Rail

Scope of Works:

  • Prepare all safe systems of works documentation and permits
  • Remove existing equipment climb 30m NRT mast and remove LoRaWAN gateway affixed at top of mast and remove the Ethernet cable which is routed from the adjacent building to the gateway.
  • Installation of all like for like replacement LoRaWAN gateway and cat 6 Ethernet IP67 cable.